Help with your seawall project·St. Augustine
Waterfront planning

Seawall Maintenance in St. Augustine

A useful maintenance plan makes changes easier to spot and gives the next professional a reliable history.

Request plan details

Create a baseline from safe ground

Divide the wall into recognizable sections: a corner, dock connection, outlet or neighboring boundary. Photograph each from repeat positions. Record the date, recent weather and any unusual water level without treating a photograph as an elevation survey.

Keep earlier plans and repair records in the same folder. If the age or construction is unknown, write “unknown” instead of estimating a remaining service life.

Make the log easy to hand over

One entry for each observation
FieldExample of useful detail
Location
North return beside the dock connection.
Change
Crack appears longer than in the dated baseline photo.
Conditions
Observed after heavy rain; water was receding.
Action
Professional notified; assessment date recorded.
Outcome
Report, scope and closeout documents linked.

Keep observation and diagnosis separate. The person maintaining a log does not need to decide the cause of every defect.

Let condition determine the review schedule

Ask the assessing professional to set a schedule based on the wall, exposure and past findings. Agree what changes should trigger an earlier visit. Do not assume an annual visual visit includes underwater investigation, structural certification or repairs.

  • Confirm whether drainage cleaning is included and who performs it.
  • Agree how access restrictions will be communicated.
  • Define the response to a new void, movement or exposed reinforcement.
  • Keep post-storm observations separate from an insurance cause-of-loss assessment.

Preserve records across repairs and ownership changes

Request the appropriate local permit history when the file is incomplete. Keep the City, St. Augustine Beach or County response with the exact property address and search terms used. A search that finds nothing is not proof that a wall was never permitted.

Use the storm checklist after unusual conditions, and the drainage guide when recurring wet areas are the concern.

Building Permit Information: bulkhead/retaining wall · Building Department · St. Augustine Beach Building

Turn a maintenance promise into a defined service

What the visit includes

Ask which components can be inspected, whether the water side is included and what conditions prevent access. Confirm the written output and whether any cleaning or minor work is separately authorized.

What happens between visits

Agree how to report a new observation, who reviews it and what response is actually offered. A recurring visit should not be mistaken for an emergency attendance guarantee.

A useful visit ends with dated findings, comparison with the previous record, completed actions and open items. Ask for changes to the inspection scope when conditions make an earlier method unsuitable. Keep repair proposals separate so you can see what the maintenance agreement itself covers.

Worried about damage? Check the warning signs.Optional · 10 short questions · no contact details

Answer from what you already know. Stay on safe ground; do not go near the edge or into the water to check. You can choose “Not sure” for any question.

Skip this and go to the request form

1. Holes, sinking ground, or soil washing out behind the wall?
2. Is the wall leaning or bulging toward the water?
3. What cracks have you noticed?
4. Gaps, missing pieces, or soil coming through the joints?
5. Is the top broken or crumbling, or is metal showing?
6. Are there rust stains on the wall?
7. Does water come over or through the wall at very high tides?
8. Has there been a major storm since the wall was last checked?
9. About how old is the wall?
10. When was the last professional inspection?
What this check is based on

The questions cover signs shown in the City of Holmes Beach seawall manual (pages 5–13): soil loss, wall movement, open joints and damaged concrete.

Show sourcesHide sources
  1. Building Permit Information: bulkhead/retaining wallSource reviewed 2026-10-26
  2. Building DepartmentSource reviewed 2026-10-27
  3. St. Augustine Beach BuildingSource reviewed 2026-10-26
Your next step

Request plan details

Tell us about your wall and how to reach you. Use this guide to plan the care it needs.

Getting your form ready…

Plan your next step.

Tell us where your property is and what needs attention.

Clear guidance for your waterfront project.