Marina Bulkhead Planning in St. Augustine

The repair footprint and the marina’s operating footprint need to be planned together.

Discuss a waterfront business project

Draw the work area and the operating area

Mark occupied slips, vessel routes, fuel and pump-out facilities, electrical and water services, loading areas and public access. Identify what must remain operational and what can close during each phase.

Have the assessment distinguish wall condition from dock, pile and utility conditions. A single maintenance invoice does not establish responsibility for every connected asset.

Make each phase a complete plan

  • The permitted work limits and temporary construction area.
  • Vessel relocation and instructions for affected slip holders.
  • Qualified parties responsible for utility isolation and restoration.
  • Equipment access, material handling and debris protection.
  • Who may change the sequence and who informs marina users.

Review commercial-waterfront authorizations

Ask the project team to identify local building requirements, state environmental and submerged-land authorizations, and federal review. Dock changes, fill and a new wall alignment should be described explicitly. Do not assume an old marina authorization covers a materially different repair footprint.

The Corps’ current regional conditions and the actual project authorization matter. Check them with the regulatory office before the schedule relies on a general-permit category.

Northeast District Permitting · Nationwide Permit Information

Define the conditions for reopening

Handover questions for each phase
AreaAsk for
Wall and dock
Agreed inspections and structural closeout records.
Utilities
Checks by the qualified parties responsible for those systems.
Navigation
Confirmation that work obstructions and restrictions are addressed.
Operations
Updated access notices and the person authorizing reopening.

Keep permit conditions, incident procedures and emergency contacts in the marina’s operating file. The dock coordination guide helps clarify scope interfaces before procurement.

Use a phase sheet for every change in operations

Before the phase starts

List the affected slips, vessel movements, utility arrangements, work access and responsible contacts. Check the proposed phase against the authorized footprint and agreed operating restrictions.

Before the phase reopens

Collect the required checks and completion evidence, remove or update temporary notices and identify the person authorizing the return to use. Carry unresolved items into the next phase explicitly.

Keep a revised sequence visible to staff and affected users. If an unplanned condition changes the work, have the responsible project team review the design, permits and operational consequences before treating it as a routine schedule adjustment. Marine construction completion and readiness for public or tenant use should be documented separately.

Show sourcesHide sources
  1. Northeast District PermittingSource reviewed 2026-10-26
  2. Nationwide Permit InformationSource reviewed 2026-10-26
Your next step

Discuss a waterfront business project

Record the affected shoreline and the decision you need to make. Use the notes when discussing scope with the appropriate professional.

Getting your form ready…

Plan your next step.

Tell us where your property is and what needs attention.

Clear guidance for your waterfront project.