Neighbors & shared planning

Neighbor Seawall Projects in St. Augustine

A shared waterfront makes coordination useful. Keep each parcel’s condition, permissions and decision clear.

Ivory waterfront homes, shaded verandas and concrete seawalls beside tidal water
Nearby homes, individual property decisions.
Start a neighbor group

Start with the point where the walls meet

Have each owner identify their property boundary and the wall section they control. Gather the surveys before discussing a continuous cap or a common contractor. The most useful shared drawing shows transitions, outlets, dock connections and access routes.

If one wall is repaired and the next remains, ask the designers how the junction will be treated. A continuous-looking edge does not prove that neighboring structures have the same foundations or support.

Put the shared items on one planning sheet

Coordinate these; price each property separately
Shared questionIndividual decision
Can equipment use one access route?
Each affected owner gives appropriate permission.
Can deliveries be coordinated?
Each quote states its mobilization share.
Do the designs meet at a common edge?
Each parcel retains its own approved scope.
What if one project is delayed?
Each agreement explains the revised price or sequence.

Do not merge the permit assumptions

The same shoreline can include different ownership and access conditions. Ask the local office how applications should identify each parcel, owner and work limit. State and federal review should show the complete proposed footprint where coordinated work affects it.

For oceanfront work, raise the CCCL and coastal-armoring questions early. A neighboring approval does not establish that a second parcel is eligible for the same construction.

Building Permit Information: bulkhead/retaining wall · Building Department · Coastal Construction Control Line Program

Ask for the price if only your project proceeds

Compare a standalone price with a coordinated price using the same scope. Ask which saving comes from shared logistics and which depends on an assumption. Avoid committing to a discount that disappears without a defined fallback.

  • Record who is interested without circulating private contact details.
  • Let each owner choose their adviser and contractor.
  • Keep deposits, change orders and warranties property-specific.
  • Agree who communicates changes to the schedule.

Use the access guide to make the shared plan concrete.

Agree a fallback before inviting bids

If both owners proceed

Ask the bidder to separate shared mobilization from each parcel’s construction. Record who obtains access permissions and how the work at the boundary is coordinated.

If one owner pauses

Request the remaining owner’s standalone scope, price basis and revised sequence. Make clear which shared arrangements end and who tells the affected contractors.

Keep invitations about coordination. Do not promise a discount, preferred contractor, permit result or start date on another owner’s behalf. Each owner should receive the documents and make their own commitment.

Show sourcesHide sources
  1. Building Permit Information: bulkhead/retaining wallSource reviewed 2026-10-26
  2. Building DepartmentSource reviewed 2026-10-27
  3. Coastal Construction Control Line ProgramSource reviewed 2026-10-26
Your next step

Start a neighbor group

Tell us your canal or community and how to reach you. Use this guide to work out the next steps for your group.

Getting your form ready…

Plan your next step.

Tell us where your property is and what needs attention.

Clear guidance for your waterfront project.